Switch off Titan Krios
You need to find a couple of things:

Never close the Gatan rack, this will overheat the equipment!!!
-
Close SerialEM on Gatan pc.
-
Close SerialEM server on Titan pc.
-
Close Digital Micrograph on Gatan pc, wait for "save filter alignment message": click yes.

-
Switch off Gatan Digitizer (blue box in the back of the room).


-
Switch off Gatan pre-processor.

-
Switch off Gatan GIB.

-
Switch off Gatan Peltier cooler.


Close all on Titan pc: right-click on the stop button on the right,
choose "stop all".
Wait until all applications are stopped (all white
in applications window).

-
Switch of 60 VDC supply in the Power rack.


-
Switch off power cabinet: switch all red marked switches off, leave IGP supplies on!!!
-
If needed, also switch off the water chiller in the small service room, blue button on the left.


Switch on Titan Krios
-
Switch on all flip switches on power cabinet.

-
Wait 15 seconds, switch on the 60 VDC supply.

-
Switch the service monitor in the Krios room off!
-
Switch on TEM pc, open its right door, on.

Log in to Titan pc:
supervisor
Superuser#1
-
Start the Tem software: click the green play button:

In Titan UI:
-
If needed, start the vacuum system, To 'all vacuum' so that vacuum is on.

-
Run FEG warm start (~30 minutes) when the instrument was off less than 24 hours, otherwise run cold start (~90 minutes).
-
Make sure all apertures are enabled.

-
Make sure the autoloader is initialized

-
Switch HT on and set to 300KV.
-
Make sure FEG is at 4150Vex and gun lens 3.
- Switch the phase plate power supply on.

Gatan
If Titan Krios projection vacuum is ok:
-
Switch on Gatan Peltier cooler.

-
Switch on Gatan GIB.

-
Switch om Gatan pre-processor.

-
Switch on Gatan Digitizer.

-
Switch on Gatan pc: this will take a while and the monitor meanwhile will be black.

Log into Gatan pc:
administrator
$admin
-
Start Digital Micrograph.
-
Give it some time, reference images will be uploaded automatically.
Titan
On Titan pc:
-
Software launcher click the blue stop buttonm wait untill everything is
closed, then click the green start button and wait untill everything
has started:

- Check if the K2 is seen by the FEI software, camera dropdown list should contain EF-CCD:

Gatan pc
- Start SerialEM on the Gatan pc.